
Benefits
Building scheduling capabilities into your application requires that you
deliver features end-users have come to expect from today's leading PIMs.
An advanced scheduling system is not just about appearances but how information
can be presented and processed by end-users in an efficient manner. Building
upon the interface options introduced in Microsoft Outlook, ExpressScheduler
gives you the ability to create a superior UI with unrivaled flexibility
and design options. Once you begin using ExpressScheduler, you will find
it one of the most capable products of its kind in the market and loaded
with dozens and dozens of features that are a simple property setting
away from implementation.
Features
Days View and Time Rulers - The Day View offers the most detailed picture
of events for a given day. It displays events within vertical timelines
where an event's top-most edge corresponds to its start time and its bottom-most
edge is the finish time. The primary features of this layout option are:
- Work time display - You are
able to specify work hours within the timeline for more efficient
end-user scheduling
- Multi-Day View - You can easily
switch from a single day view to multiple days to obtain a better
perspective of time availability
- The Day view displays the current
date/time by highlighting the header corresponding to the current
date and indicating the current time on the time ruler
- Display all-day events above
the timeline
- An advanced time ruler with
a customizable scale offering you the ability to display an additional
time ruler for a different time zone
- Scroll buttons displayed at
the top or bottom of time rulers that indicate whether additional
events exist in any non-visible region of the Day view. These buttons
can be clicked to scroll to the next/previous event
Week View - The ExpressScheduler
Week view displays events for any given weekly period. Its primary features
include:
- Weekend compression (also available
for multiple resource views when grouping by dates - in this instance,
week days are arranged horizontally)
- Able to display an event's start
and end times using either digits or clocks
- Optional suppression for the
end time of individual events
- Buttons indicating that additional
events exist but which did not fit into the screen region. Clicking
this button switches the view to the corresponding date
- Current date indication by highlighting
the corresponding date header
Multi-Week View - The weeks view
is the least detailed view designed to allow your end users to browse
and analyze long-term plans. This view positions days one after another
horizontally so that they construct weeks while weeks are placed one under
another. Its primary features include:
- Automatic coloring for dates
corresponding to different months
- Optional weekend compression
- Optional suppression of event
end times
- Showing event start time as
digits or clocks
- Buttons indicating that additional
events exist but which did not fit into the screen region. Clicking
this button switches the view to the corresponding date
- Current date indication by highlighting
the corresponding date header
Multiple Resources Display - The
multiple resources display enables your end users to browse several plans
(for any entity such as an individual or office location, etc) simultaneously.
To enable this feature, you simply need to provide several resources in
the bound storage. Each resource is just an ID for a particular plan -
it has a unique label and a caption to display within the calendar. As
such, it doesn't matter which resource types you need to display - human
resources, department resources, etc. Once resources have been created,
the scheduler will display several parallel timelines. Following is a
brief overview of the features available within the multiple resource
view:
- If resources are present, you
can specify whether plans should be grouped first by dates or by resources.
Note that you can change the default grouping style and override it
for particular view types (days view, week view and weeks view)
- Timelines for different resources
are automatically colored (You can also provide colors for resources
manually.)
- The scheduler provides a context
menu allowing you to invoke the resource customization window. This
enables end users to show, hide and rearrange resources with ease
Date Navigator - The ExpressScheduler's
built-in date navigator offers extremely intuitive access to desired time
frames. It doesn't matter whether you need to select a particular day,
a range of days, a week or multiple weeks - everything is done with a
single mouse operation! Each date selection change automatically updates
the scheduler's view but this is not the end of the story - you can also
use the date navigator as a separate control for any purposes you need.
Its features include:
- Ability to display week numbers
- Optional bold mark-up for dates
that have events assigned
- Switching between integral or
live sizing
- Quick month navigation by clicking
the month header and scrolling the popup month list
Control Box - The ExpressScheduler allows you to insert any control into the region under the built-in date navigator. This gives you the ability to provide really consistent user interfaces whenever you need to add custom control elements to a scheduler, imitate the MS Outlook's task list or display any other scheduling related information.
ExpressScheduler Main Page
ExpressScheduler
is electronically deliverd.
Home || Shopping
Cart || Site Map || Newsletter/Blog
Search HALLoGRAM || Request
More Information
CALL TOLL FREE 1-866-340-3404
|
|